City of Yuma | C.I.P. NO. 0223 - Parks | Federally Funded - Section 3

Joe Henry Optimist Center Gym Renovations

Project description - existing

  • Project square footage 6,907 SF​

  • Original construction 1969

  • Roof/ceiling/walls  R-5.6, continuous foam insulation

  • Rooftop evaporative coolers, relief fans, gas heaters

Scope of Work

  • 200A, 3PH/4W, 120/240V panel

  • 2-10 ton package heat pumps

  • Combination economizer & powered exhaust

  • BACNET compatible

  • Ductwork exterior/interior

  • Equipment concrete housing pad & steel mechanical frame

  • R-19 retrofit batt insulation with vinal face at walls

  • R-30 retrofit batt insulation with vinal face between purlins at ceiling

  • 4-Double doors/hardware

R-19 Insulation
R-19 Insulation
press to zoom
R-30 Retrofit Batt Insulation
R-30 Retrofit Batt Insulation
press to zoom
Framing 1
Framing 1
press to zoom
4 -Sets New Double Doors
4 -Sets New Double Doors
press to zoom
Form Work
Form Work

Heat Pump Foundation

press to zoom
Reinforcing Steel
Reinforcing Steel

ASTM A615, Grade 40 #3 ASTM A615, Grade 60 #4

press to zoom
Concrete Foundation
Concrete Foundation

f'c = 3,000 psi design strength

press to zoom
Setting Mural Panels
Setting Mural Panels
press to zoom
New Electric Panel
New Electric Panel
press to zoom